DRIVUŠA-GORICA MOTORWAY OCTOBER UPDATE
The following construction works are under way: filling of rock aggregate embankments (0-300), filling and rolling of the motorway course, construction of a 2,000 mm cylinder culvert with a culvert end, construction of a 2,000 mm cylinder culvert with access manholes, construction of a 97-metre long retaining wall, laying of Reno Mattresses, building of retaining walls and resoiling over the mattresses, construction of RC access manholes for culverts and wastewater drainage, stabilization of the Gorica landslide, excavation of surface soil and its disposal at a designated landfill, filling, gravelling and rolling of the Drivuša toll station plaza, building of retaining walls and resoiling of slopes.