RADOVI NA SANACIJI I REMONTU TRAMVAJSKE PRUGE

RENOVATION AND OVERHAUL OF TRAMWAY TRACKS

The renovation and overhaul of the tramway system in Sarajevo continued with the paving of the tramway line between the Institute of Hygiene and Marijin Dvor, the digging of cable ducts and the laying of electrical cables for public transport, the setting up of road signs and access restrictions for the strip of the construction site between the Orthodox church in Baščaršija and the Eternal Flame monument. The project is proceeding according to schedule. Below you may find the latest photo updates.