FIRST LINER PLATE INSTALLED IN ALBANIAN TUNNEL
Euro-Asfalt has been contracted to take part in the excavation and construction of the QAFE BUALL Bulqize tunnel in Albania. The length of the tunnel is 460 metres, including 24 metres of the portal section, and 436 metres of cutting. The tunnel is being excavated using the New Austrian Tunnelling Method (NATM).
The project is proceeding according to schedule. The first liner plate was installed today.