8

DRIVUŠA-GORICA MOTORWAY DECEMBER UPDATE

The following construction works have been under way at the A1 motorway section between Drivuša and Gorica: transportation, filling and rolling of the rock embankment along the course of the motorway, removal and disposal of cut-off drains long the river Bosna, and the construction of retaining walls (resoiling) at certain sections of the motorway course.

At the Drivuša toll station building site, workers are performing excavations for the relocation of the 160 mm pipeline under the plaza, as well as the filling of 0—32 mm graded aggregates around the plaza foundation beams. Upcoming tasks include the installation of drainage systems along the motorway course and the Drivuša toll station, construction of cable ducts, and the stabilization of the Gorica landslide. The project is proceeding according to schedule.