Projects under construction
The total length of the 5c Corridor section between Svilaj and Odžak is 10.8 kilometres. A consortium led by Strabag AG from Austria, and also including Bosnian-Herzegovinian companies Euro-Asfalt and ŽGP from Sarajevo, won the construction bid. Apart from the motorway, this project also envisions the construction of a border crossing at Svilaj, and two junctions Svilaj and Odžak. Notable structures include two junctions Svilaj and Odžak, three bridges, a resting area, and three flyovers.
A consortium led by Euro-Asfalt was engaged in the construction of the Primary Urban Thoroughfare in Zenica. The total length of the thoroughfare, including service roads and roundabouts, is 7.8 kilometres, of which the main road stretches for 3.2 kilometres. The project envisioned the construction of the main road, service roads, the regional road, bridges, concrete structures, the complete drainage system, street lighting, as well as removal of 30,000 cubic meters of category V and VI materials followed by asphalt paving.
Euro-Asfalt is also involved in the cutting and construction of the QAFE BUALL Bulqize tunnel in Albania. The total length of the tunnel is 460 metres. The portal area is 24 metres long, while the cutting is 436 metres long. The cutting technique applied in this project is the New Austrian Tunnelling Method (NATM).
In 2010, Euro-Asfalt was also engaged in the reconstruction and rehabilitation of the existing multi-storey car park which forms a part of the Euro Park shopping mall in Maribor, Slovenia. This chain of shopping malls is well-known across Europe. Thanks to its experience, Euro-Asfalt was able to use this engagement to establish a foothold in the Slovenian market, where it plans to stay for the long term.