mala_1338836196

RECONSTRUCTION OF R-445 – ILIJAŠ ROAD

Work has commenced on the reconstruction of the section of the R-445 road passing through Ilijaš. 1,118 metres of road surface will be reconstructed. The project envisions a complete reconstruction of the full width and length of the upper layers (replacement of the existing subbase, pavement, kerbs, and drainage systems). The time for completion is 60 days. Presently the workers are replacing kerb stones and reconstructing the right slotted pipe drain.